Despite a great deal of new regulation and legislation for the Private Rented Sector (PRS) in the past few years, more was due this Autumn 2019 but has yet to go through.

The biggest, headline-change is expected to be the introduction of mandatory five-year electrical installation checks on private rented accommodation in England, which the Ministry of Housing, Communities and Local Government (MHCLG) propose to implement in a phased approach.

What’s in the pipeline?

Heather Wheeler MP, the Parliamentary Under Secretary of State at MHCLG, said in late February that mandatory electrical safety checks in the PRS would be introduced ‘as soon as possible’. No implementation date has yet been given, but MHCLG said it hopes to introduce the new legislation as soon as parliamentary time allows for it. It’s perhaps not surprising then that this still has yet to happen.

Following a consultation on ‘Electrical safety in the private rented sector’, which ran from February to April 2018 and received 582 responses from a range of organisations and individuals, including electricians, letting agents, local authorities, individual landlords and tenants, and fire and rescue representatives, the Government responded in January 2019.

Guidelines for Inspectors

It states that the new rules will require landlords to make sure that the inspectors they hire to conduct checks have the necessary competence and qualifications to do so. Tough financial penalties will be levied on those that fail to comply.

New guidance will be published, outlining the minimum level of competence and qualifications needed for those conducting these inspections.

MP Heather Wheeler said the new measures will lessen the risk of faulty electrical equipment in homes, in turn giving tenants peace of mind and prioritising their safety. She added that the measures will provide clear guidance to landlords on who they should be hiring to carry out these vital electrical safety checks, with the guidance also providing clear accountability at each stage of the inspection process – of what is required and whose responsibility it is – without ‘placing excessive cost and time burdens on landlords’.

Time to prepare

The Government insists the property industry, which is broadly supportive of the new measures, will be given at least six months to ‘become familiar with the new duty’ before it comes into force.

There are also a number of elements to the phased approach, which is based on the framework used in Scotland in 2015 , when the Scottish Government implemented similar new rules to make electrical safety inspections in private rented properties mandatory. These are as follows:

  • A transitional period will apply in the first two years, with the new rules only applying to all new private tenancies in year one, before being extended to all existing private tenancies in year two.
  • Rental properties with an existing EICR (electrical installation condition report) will not need to replace it for five years from its start date.
  • In the case of new and fully rewired properties, an Electrical Installation Certificate can be provided instead of an EICR as long as the date of the next inspection indicated on the certificate has not elapsed.

What happens next?

The proposals still need to be fully approved by Parliament (it hasn’t to date – October 2019). The regulations are subject to the affirmative procedure and will need to be debated and approved in both the House of Commons and the House of Lords before they can be brought into force.

Once the regulations have been approved, they will be introduced on a phased basis, starting with new tenancies.

The consultation’s other major recommendations revolved around promoting voluntary action by landlords to improve electrical safety standards in the sector, for example by conducting visual checks of electrical installations at the change of a tenancy. A high level of support for all measures of landlord action were recorded in the consultation paper.

The Government will now update it’s ‘How to Let’ booklet to encourage landlords to carry out these actions when the new regulatory requirements come into play. Government will also engage with industry stakeholders to produce new guidance setting out how landlords can determine competence. As well as this new guidance, Government will also encourage competent person scheme operators to set up new electrical inspection and testing schemes which inspectors and testers could opt to join.

The new guidance and any voluntary competent person schemes will be finalised six months ahead of the new regulatory requirements coming into force.

There is an insistence that the industry will be given at least six months to come to terms with the new regulations before they become law (and the same timeframe for the finalisation of new guidance and any voluntary competent person schemes). Since we are now in October 2019 with little sign of movement (and the current turbulence in Government) there is every chance the measures won’t now be introduced until early 2020.

However, it’s important to be aware of what is coming. And, even before the new measures come into play, it’s a wise idea for Landlords – or your letting agent on your behalf – to keep on top of safety in rental properties, including regularly checking any electrical installations to ensure tenants are put at no risk of faulty equipment and the possible hazards this could cause. At Buzz, we are of course happy to carry this out on your behalf. Please just give us a call or ask your letting agent to get in touch.