Industry

Gloucestershire Warwickshire Steam Railway plc

Location: Winchcombe, Gloucestershire


The works at the principal station, Toddington Railway Station have included:


  • Rewire of existing engine goods shed & workshops 
  • Total rewire of new LED lighting 
  • 3-phase engineering machinery , general wall mounted single & 3 phase sockets for general use.
  • Wall mounted 110-volt low voltage general use sockets.
  • New distribution boards 3 phase and main distribution 250 amp Panel board installation & associated SWA sub mains cables installed to various sub distribution boards around the site at the station
  • Full wiring containment throughout rewired in Galvanised steel trunking & conduit system.
  • New external LED Floodlighting of yard area.
  • New refurbishment of external power 3 phase to sidings electrical distribution tap off boxes, utilising IP65 enclosure for connection of all power tools/welding equipment for maintenance on steam engines , located on sidings rail tracks.

Works at Broadway Station have included the new installation of a signal box in steel conduit. The station is currently under development and due for completion in early 2018.